Construction Progress: Building Your Future Home

We believe in complete transparency. This page is dedicated to providing you with the latest Ashtech Presidential Towers construction update. Track our progress as we build one of the most anticipated upcoming luxury high-rise apartments in Greater Noida West.

10 Oct 2025 RERA
Launch Date
Sept 2030 Scheduled
Possession
5 Towers
Under Development
3 Basement
Levels
TQ Cert Quality Audit
Every Phase

The Schedule

Current Status and Timeline

The project is committed to the RERA-approved possession date of September 2030.

As one of the RERA registered luxury projects in Noida Extension 2026, development is phased through to 2030 under the filed schedule.

  1. 10 October 2025

    RERA Registration and Launch

    Registered with UP RERA as UPRERAPRJ746615/10/2025, promoter Ashtech Industries Private Limited (UPRERAPRM395505). Project finance in place with Kotak Mahindra Investments Limited.

  2. Phase one

    Excavation and Three-Level Basement

    Excavation across the 5.6-acre plot, then three basement levels beneath the towers and clubhouse.

  3. Phase two

    Tower Structures

    Superstructure for the five towers, three rising to G+28 and two Gold Towers to G+30, cast with Ashtech Group's own ready-mix concrete.

  4. Phase three

    Clubhouse and Podium

    The three-level 70,000 sq ft clubhouse, podium landscape, water bodies and the vehicle-free surface.

  5. Phase four

    Facade, Fit-Out and Services

    Aluminium crown facade system, wraparound balconies, hot and cold VRV air-conditioning, lifts, and the interior fit-out of lobbies and residences.

  6. September 2030

    Scheduled Possession

    Handover per the timeline filed with UP RERA. Any revision must be filed with and approved by the authority.

On Site

Latest Milestones

A stage is marked complete only once signed off and reported, so this board matches what is filed with UP RERA.

  • Foundation Work

    Piling and raft foundation across the tower footprints.

    Scheduled
  • Basement Construction

    Three levels of basement parking beneath the towers and clubhouse.

    Scheduled
  • Tower Structures

    Slab casting for the five towers, three G+28 and two G+30.

    Scheduled
  • Clubhouse Excavation

    Excavation and substructure for the 70,000 sq ft clubhouse.

    Scheduled

Last reviewed 2 September 2026. Stage-by-stage progress is reported to UP RERA each quarter; check the filings yourself for the position of record.

From the Site

Construction Update Film

The developer's own construction film from the Ashtech Presidential Towers site. To see a finished Ashtech interior instead, watch the residence walkthrough on the home page.

Rebar grid being laid for the raft foundation at Ashtech Presidential Towers, a still from the construction film

Walk through the residence

Ashtech Group ready-mix concrete plant with storage silos and transit mixers

Ashtech Group ready-mix concrete plant

The Standard

Commitment to Quality

Quality checks, material testing and structural audits run on site throughout construction.

Ashtech Group has made construction materials since 1992. The concrete, fly ash bricks and AAC blocks here come from its own plants: unusual control over what the building is made of.

  • TQ Cert, a Tata Group company. Safety, quality and planning independently audited at every phase.
  • IGBC certified. Assessed for sustainability by the Indian Green Building Council.
  • In-house ready-mix concrete. Over 10 million cubic metres delivered annually across Delhi NCR from fully integrated plants.
  • Aluminium crown facade system. Engineered rather than assembled on site.
  • Seven-tier security with monitored access from the construction phase onward.

Independent Check

Verify Our Progress Yourself

Every registered promoter in Uttar Pradesh files quarterly progress reports with UP RERA, and those filings are public.

Search the Registration

Look up UPRERAPRJ746615/10/2025 for the approved plans, declared timeline and quarterly progress reports.

Read the Quarterly Filings

That quarterly filing, not a marketing page, is the position of record for construction status.

Check the Promoter

Promoter Ashtech Industries Private Limited, ID UPRERAPRM395505, with all registered projects listed against it.

Visit the Site

The sales gallery is open every day, 10:00 AM to 6:30 PM. Supervised site visits on request.

Questions

Construction: Frequently Asked Questions

When is possession scheduled?

September 2030, as filed with UP RERA under registration UPRERAPRJ746615/10/2025. The project was launched on 10 October 2025.

How can I verify the construction status independently?

Every registered promoter in Uttar Pradesh files quarterly progress reports with UP RERA. Search registration number UPRERAPRJ746615/10/2025 at www.up-rera.in to read the filings directly, rather than relying on any marketing summary.

Who is building Ashtech Presidential Towers?

Construction is by Ashtech Group, in infrastructure since 1992 and supplying its own ready-mix concrete, fly ash bricks and AAC blocks. Safety, quality and planning are audited by TQ Cert, a Tata Group company, and the project is IGBC certified for sustainability.

How often are construction updates published?

This page is refreshed as milestones are reached, alongside the quarterly progress reports filed with UP RERA. To be notified directly, call +91-9717201789 or submit the form below and ask to be added to the construction update list.

Can I visit the construction site?

Yes. Site visits are arranged through the sales gallery at GH-01, F, G, H and I, Sector 12, Greater Noida West, open Monday to Sunday from 10:00 AM to 6:30 PM. Call +91-9717201789 to book a slot, since access to active construction areas is supervised.

Does a delay change my agreement?

The possession date filed with UP RERA is the contractual one. Any revision must itself be filed with and approved by the authority, and your rights in that event are set out in the agreement for sale and in the RERA Act. Read both before you sign.

Stay Informed

Get Construction Updates as They Happen

Ask for the construction update list and a relationship manager will send each milestone as it is reported, with the current cost sheet.

3 & 4 BHK, starting at ₹2.61 Cr*

*Terms and conditions apply. Price is indicative and subject to change; taxes and other charges extra.
Operating Hours Monday to Sunday, 10:00 AM to 6:30 PM
Please enter your name.
Please enter a valid phone number.

By sending this enquiry, or by entering your name and number above, you authorise us and our representatives to contact you by phone, WhatsApp and SMS about this project, including on a number registered with DNC or NDNC. We use your details only to answer your enquiry and never sell them. See our Privacy Policy.